Dynamic Simulation of Paper Roll Conveyor Up-End System and Load Assessment (2010)

Subsea Production Flowline Pig Launchers and Receivers for White Rose Project (Newfoundland): North Amethyst (2009)

 

Pressure & Strength Design to ASME B31.3 & ASME VIII Division 1; Lifting component design to Lloyd's Rules: Lifting Appliances in a Marine Environment and consideration of DNV 2.22; Anode Design to DNV B401

Images

Confidential

 

Gas Turbine Failure: Independent Critical Review of Analysis performed to predict deformations of failed components in a 45-55 MW Class Gas Turbine. The review was performed to support litigation and damage claim (2009).

 

Turbine Blade Washing System for Pratt & Whitney Canada (2009)

Pressure & Strength Design Validation and Modifications

 

Pressure & Strength Design to ASME VIII Division 1 (2007), Fatigue Design to ASME VIII Division 2 (2007)

Environment Canada: Refrigerated Water Quality Monitoring Trailer

Design of overall configuration, design of structural frame, dynamic road response analysis, fabrication support. Grantec is the Intellectual Property (IP) holder for this design.

Finite Element Analysis (FEA) of Fitting(s) for Canadian Registration

with Alberta Boilers Safety Authority (ABSA) (2009)

 

Finite element analysis performed in accordance with ASME Code

requirements and ABSA FEA Submission Requirements

Exchanger Bundle: Finite Element Analysis and Code Calculations for validation to ASME Section VIII Division 1 UHX code requirements (2009).

 

Image

Coming

Soon

 

Wave Energy Generation Device: Development of moored reaction mass response models for development of reaction mass (false bottom) mooring system. (2008)
PC-3 Seismic Analysis of Sequoia Detector and Sample Vessels for the Spallation Neutron Source (SNS) Project (SNS), Oak Ridge National Laboratory (ORNL), Oak Ridge, Tennessee. (2008)

PC-3 seismic analysis performed in accordance with DOE-STD-1020-2002 and independently peer reviewed. The Sequoia Detector Vessel is considered to be one of the largest vacuum chambers ever built in North America.

Sequoia Starts-up Oct 7, 2008: Download ORNL Notice and Info on Sequoia PDF

Business Excellence Magazine: Download Feature Article on Grantec and Sequoia PDF

The Engineer Magazine:           Download Feature Article on Sequoia Detector Vessel PDF

Design and analysis of Sequoia Detector and Sample Vessels for the Spallation Neutron Source (SNS) Project (SNS) Oak Ridge National Laboratory (ORNL), Oak Ridge, Tennessee.

 

Design to ASME Section VIII Div 1 and to ASME Section VIII Div 2 for fatigue. Seismic analysis and design to meet PC-2 requirements. The Sequoia Detector Vessel is considered to be one of the largest vacuum chambers ever built in North America.

 

Sequoia Starts-up Oct 7, 2008: Download ORNL Notice and Info on Sequoia PDF

Business Excellence Magazine: Download Feature Article on Grantec and Sequoia PDF

The Engineer Magazine:           Download Feature Article on Sequoia Detector Vessel PDF

Multistage Flash (MSF) Desalination Vessel, 22 Tubular Exchanger Stages, weight 500 tons. Complete FEA Based Code Design Analysis, ASME Section VIII Div 1

Harbour Solutions Project (Halifax Harbour Clean-Up Project):

Independent Review of Baseline Vibration Survey & Assessment for Dartmouth Waste Water Treatment Facility (WWTF)

Shock & Vibration Analysis of Expendable Mine Neutralization System (EMNS) Launch & Recovery System for US Navy Mine Counter Measures (MCM-1) Avenger Class Ships

 

Lockheed Martin EMNS Press Release November 19, 2007:

Press Release       Press Release PDF Download

 

Photo courtesy of www.navsource.org

Trident Enhancement Project Compression Chamber ( Vacuum Chamber ), Los Alamos National Laboratory, Los Alamos, New Mexico. Complete FEA-based code design analysis, ASME Section VIII Div 2

Confidential Client: Marine Riser Analysis - China
Petro-Canada: Marine Riser Analysis for Rowan Gorilla VI Jack-Up
Husky: Marine Riser Analysis for Rowan Gorilla VI Jack-Up

 Experience:

  Featured Projects Back

 

© 2007 - 2009 Grantec Engineering Consultants Inc.

   Halifax , Nova Scotia , Canada

 

Home   Back

 

This page is an in-line frame from the Grantec website www.grantec.ca

Select Home to go to Grantec's home page to see full range of services.

 

> Atlantic Canada Halifax Saint John's Houston Calgary London Aberdeen Toronto Ottawa Canada